2004 CDF E-Log -- Eve shift. Mon Mar 8, 2004
SciCo DAQ Ace Monitoring Ace CO (Operations Manager)
Rei Tanaka Andrew Ivanov Catalin Cioban Guenakh Mitselmakher Rob Harr


Start of Shift Notes:   There was trouble with Web server, so this shift had no regular entries...


Tue Mar 9 01:35:40
EVE Shift Summary
+++++++++++++++++++++++++++++
==============================================
March 8, 2004 Evening Shift
   Scico:Rei Tanaka
   DAQ ACE: Alison Liste
   MON ACE: Catalin Cioban
   Co: Guenakh Mitselmakher

Accelerator
- Inherit Store #3277. Initial Lumi=16E30
  Initial Stack=137E10.

-----------------------------------------------

17:15 Ops Manager told us that there shall be 1-2
      hour study Of Synchrotron Light Study after 10:00.
      There should not be any affects on the beam, but
      watch Lostp And Abort Gap carefully.

18:05 Display of Svxmon and Objmon Cannot Be Started.
      Paged Consumer And Kohei.Rainer Fixed It.

18:25 Couple Of Yellows (No Data) in chip status in Svxmon.
      Paged Silicon. Also Rainer is here. Have to reset
      several Ladders.
   19:40 Halted the  Run179726 for a while.
   20:10 Started new Run179727.
   21:30 It appears that a part of ISL/SVX is missing.
         We do not know when this happend since SVXMON was
         hanging up this afternoon. We will try to fix this
         problem now because the luminosity is alreadylow (13E30).
   22:00 CO says that he saw these yellow warnings (no chip data)
         after 18:00 for Run179726 (very long run).

18:40 Paged Online System Admins asking for the status Of Online
      Web Server. Serguei will contact Jeff about the status.
      First it was foreseen that we could recover by 6p.m., but
      it takes longer.
   22:40 After talking with Ops Manager, decided to paae Online
         System Admins again to ask the status.
   22:50 Called Jeff Schmidt. He is working at his home. He says
         that it takes a couple of hours more to finish the data
         transfer and resume the server.He should call us at 1-2a.m.

20:00 Posted CDFNEWS telling the web server situation. I submitted
      from SciCo desk at B0 control room using Netscape. It was
      submitted under the name of Young-Kee instead of SciCo (I
      assumed  this). Sorry Young-Kee for this.

20:12 Has problem with DAQ. Paged L3. Terminated run179726.
      New run is 179727.

20:30 Called Serguei Bourov about the situation of web server.
      He says that we need at least a couple of hours for database
      transfer after the run stopped. We have to still wait for web
      server recovery. Serguei Bourov or Jeff Schmidt should call us when
      finished.

21:45 Accelerator called us. They are starting synchrotron light
      study in 15 minutes.

21:55 MCR called us if we turned HV down. Answered NO since we did
      not touch anything. Also checked Cryo tech. Everything is normal.

23:00 Talked to Ops Manager. After beam dump, we shall have
      quiet time. We will do quiet time calibrations and no-beam trigger
      table tests without silicon.

23:30 MCR called us. Beam dump soon.
23:40 Beam dumped. Quiet time for 30 minutes.
23:50 Starting quiet time calibration without silicon. Then we will
      do no-beam trigger table test.

-----------------------------------------------------------------------

Shift summary

RUN:       179726 - SVX/ISL chip problem (after 18:00?) but to be
                    marked good run
           179727 - same problem as above (good run)
           179728 - same problem as above (good run)
Delivered: 385.07nb-1
Acquired:  345.22nb-1
Efficiency: 89.7%

CDF
- Was in good shape until we found the problem with missing L00 chips
  at 18:00. (RUN179726 - ,  ).

Plan:
- Store dump forseen at 24:00 tonight. After that do,
  Quiet Time Calibrations
  Test 3 Trigger Tables, 5 minutes each.
       1) Physics_2_02[2,424,437 Page Kaori And
          Call Gilles(X2328)
       2) Physics_Test_2_02[11,437,438]
       3) Test_Alpha_Clustering_Nospikes[5,438,403]
  Calibrations, Cosmics


 - Rick Field