|
2004 CDF E-Log -- Owl shift. Tue Mar 2, 2004 |
| SciCo |
DAQ Ace |
Monitoring Ace |
CO |
(Operations Manager) |
| S.Miscetti |
S.Sabik |
A.Ivanov |
B.Mohr |
M.Convery |
Start of Shift Notes:  Tevatron study in progress.
Test JET_ST3_DECOUPLED[1,433,403]
run level 2 torture
Tue Mar 2 00:05:56
Run 179510
TERMINATE: JET_STD3_DECOUPLED[1,433,403] - Simon x2080
Tue Mar 2 00:15:51
Run 179511
ACTIVATE: L2_TORTURE[15,390,406] - Simon x2080
Tue Mar 2 02:12:09
Run 179511
TERMINATE: L2_TORTURE - Simon x2080
Tue Mar 2 02:22:02
MCR called they are dropping the beam.
COT OFF, CLC OFF, SVX StandBy. - S.Miscetti
Tue Mar 2 02:22:11
Beam has been dropped. CLC is off.
- Andrew
Tue Mar 2 02:29:24
Run 179512
ACTIVATE: CAL QIE Calibration - Simon x2080
Tue Mar 2 02:30:42
Run 179512
TERMINATE: CAL QIE Calibration - Simon x2080
Tue Mar 2 02:32:17
Run 179513
ACTIVATE: CLC QIE Calibration - Simon x2080
Tue Mar 2 02:34:29
Run 179513
TERMINATE: CLC QIE Calibration - Simon x2080
Tue Mar 2 02:36:59
Run 179514
ACTIVATE: BSC QIE Calibration - Simon x2080
Tue Mar 2 02:37:00
Run 179514
TERMINATE: BSC QIE Calibration - Simon x2080
Tue Mar 2 02:39:17
Run 179515
ACTIVATE: TOF QIE Calibration - Simon x2080
Tue Mar 2 02:39:18
Run 179515
TERMINATE: TOF QIE Calibration - Simon x2080
Tue Mar 2 02:47:16
Run 179516
ACTIVATE: SMX QIE Calibration - Simon x2080
Tue Mar 2 02:47:17
Run 179516
TERMINATE: SMX QIE Calibration - Simon x2080
Tue Mar 2 02:47:18
Run 179517
ACTIVATE: CEM LED CAlibration - Simon x2080
Tue Mar 2 02:47:19
Run 179517
TERMINATE: CEM LED Calibration - Simon x2080
Tue Mar 2 02:47:20
Run 179518
ACTIVATE: COT Calibration - Simon x2080
Tue Mar 2 02:47:21
Run 179518
TERMINATE: COT Calibration - Simon x2080
Tue Mar 2 02:49:47
Run 179519
ACTIVATE: Muon Calibration - Simon x2080
Tue Mar 2 02:49:48
Run 179519
TERMINATE: Muon Calibration - Simon x2080
Tue Mar 2 02:50:41
Run 179520
ACTIVATE: TOF TAC Calibration - Simon x2080
Tue Mar 2 02:52:24
Run 179520
TERMINATE: TOF TAC Calibration - Simon x2080
Tue Mar 2 02:56:42
Run 179521
Activated at 2004.03.02 02:56:27 - RunControl
Tue Mar 2 03:00:09
Run 179521
ACTIVATE: COSMICS_NOSILICON_NOTAPE [12,391,403] - Simon x2080
Tue Mar 2 03:03:38
From MCR e-Log:
" 02 Mar 2004 03:01:06
Shot setup is on hold due to Tevatron RF
station 5 failure. Experts enroute."
- S.Miscetti
Tue Mar 2 03:08:22
MCR called. They confirm they have a problem. No extimate.
They will call back as soon as the experts understand the
problem.
- S.Miscetti
Tue Mar 2 04:25:08
Report on calibrations: CLCQIE calibration (179513) did not make it into the database. All other calibrations that are possible to check in DBANA look OK. See - Brian
Tue Mar 2 04:27:39
Sorry, I messed up the html. See here for details. - Brian
Tue Mar 2 05:02:27
MCR Called. They are ready for shot-setup ..
it will start in 5 minutes.
- S.Miscetti
Tue Mar 2 06:15:13
Run 179521
Terminated at 2004.03.02 06:14:47 - RunControl
Tue Mar 2 06:15:14
Store # 3266: Final proton are being injected
- S.Miscetti
Tue Mar 2 06:15:21
Run 179521
TERMINATE: Cosmic run - Simon x2080
Tue Mar 2 06:17:17
Date Time BLM Dose
2004.03.02 06:14:51 W Inner BLM 0.00 RADS
2004.03.02 06:14:51 W Outer BLM 0.00 RADS
2004.03.02 06:14:51 E Inner BLM 8.95 RADS
2004.03.02 06:14:51 E Outer BLM 703.30 RADS
Integrated dosage
- Andrew
Tue Mar 2 06:41:27
FROM the MCR e-log:
6:31:46- The proton intensity is low out of booster at 8 turns. We tried loading with 5 bunch loads
and more turns but the transverse emittances
are high due to higher turns. We dumped the protons and are checking chroms again as has taken
longer to load. - SJC
- S.Miscetti
Tue Mar 2 07:15:57
Antiprotons have been lo
- S.Miscetti
Tue Mar 2 07:18:06
MCR called. They have just quenched!
- S.Miscetti
-- Tue Mar 2 07:31:32 comment by...convery -- 07:16:48- Quenched at C1 during acceleration. Rad trip at D0 utility room 5 counts. - Elisa
Tue Mar 2 07:18:35
L3 problem.
L3_RELAY_FAILURE_ERROR. The following Level3 converter nodes are marked bad for now: b0l3c07.
Cleaned up L3 to try recuperating the bad converter node.
L3 proxy starting for 30 minutes. Doesn't seem to be doing progress.
Expert paged. He is working from remote location to try to clean L3 again.
- Simon
-- Tue Mar 2 08:22:26 comment by...Nuno, Guillelmo -- Converter node c07 was refusing connections; it will need to be rebooted from console. l3proxy was not updating database information as per instrunction of RC, and keep trying to include c07. This node needed to be removed manually from database. After this l3proxy did start. Some leftover problems with communication with EVB from possible previous abort action, required evb cleanup. The system should be working, with subfarm c07 disabled for a short moment untill we repair it.
Tue Mar 2 07:22:32
COT off, ACE following post-quench-checkout
- S.Miscetti
Tue Mar 2 07:26:05
 | BLMs summary of Tevatron quench |
- Andrew
Tue Mar 2 07:55:18
| Run Number |
Data Type |
Physics Table |
Begin Time |
End Time |
Live Time |
L1 Accepts |
L2 Accepts |
L3 Accepts |
Live Lumi, nb-1 |
GR |
SC |
RC |
| Totals |
|
|
|
07:55:01 |
:: |
|
|
|
|
|
|
|
- End of Shift Report
Tue Mar 2 07:59:59
Shift Summary: Shift started while Tevatron study were in progress.
After completion of Level 3 work, we tested
JET_ST3_DECOUPLED and run L2_Torture.
Tevatron study and Store #3263 ended at 2:20 am.
- Calibration and cosmics taken during quiet time.
- Shot setup was on hold for 2 hours due to TRF5 problems
(water heaters).
- Shot setup for store# 3266 started around 5 am with a pbar stack of 182 mA. Proton were started to
be injected at 6:15 but, due to a low proton intensity out of booster, they dumped the beam and
started again.
At 7:15 we had a total current of P = 9900 E9, Pbar= 870E9.
Soon after the Tevatron quenched at C1 during acceleration.
- L3_RELAY_FAILURE ..problems under investigation.
- Post-quench checkout OK.
End of Shift Numbers
|
CDF Run II
Runs
Delivered Luminosity 0
Acquired Luminosity 0
Efficiency
|
- S.Miscetti
Tue Mar 2 08:06:20
Run 179522
ACTIVATE: Testing L3. Junk Data. - Tom x2080
Tue Mar 2 08:20:08
Run 179522
TERMINATE: Testing L3. Junk Data. - Tom x2080