2004 CDF E-Log -- Owl shift. Fri Feb 13, 2004
SciCo DAQ Ace Monitoring Ace CO (Operations Manager)
M. Martinez S. Sabik C. Marino JY Lee M. Convey


Start of Shift Notes:  

...taking data.... 
Lumi = 16.5 E 30 
Plan is to run until 6-7 AM ...and then Tev Studies for 
few hours (4 hours) 

Fri Feb 13 00:23:59
 - Christopher
-- Fri Feb 13 00:24:17 comment by...Christopher --  Hourly Plots
Fri Feb 13 00:36:07 CEM HV bars disappeared entirely for several minutes but have
returned to the state they were in previously.  - Christopher
Fri Feb 13 00:39:20
RED channels for CEM
 - YJ Lee
Fri Feb 13 00:53:58 We paged CAL expert after seeing the YMON plots. IN IFIX we see a red channel at EM_06_09_LSW[ID 1A7]  - Mario :: (run 179055)
Fri Feb 13 00:58:03 Run 179055 Terminated at 2004.02.13 00:57:24 - RunControl
Fri Feb 13 00:58:46 Run 179055 TERMINATE: To reset pisa box to fix CEM HV problem. - Simon x2080
Fri Feb 13 00:58:48 CMX trip.... We decided to stoip the run to allow the reset of the CEM channel (following instructions from CAL expert) We will resume data taking as soon as the HV for the CEM channel is done - Mario
Fri Feb 13 00:59:04 CMX trip. South West channel 15. Halted run. Turned SW back on. It recovered. - Simon :: (run 179055)
Fri Feb 13 01:11:19 Run 179056 Activated at 2004.02.13 01:11:11 - RunControl
Fri Feb 13 01:12:11 Run 179056 ACTIVATE: PHYSICS_2_01 [4,416,424] - Simon x2080
Fri Feb 13 01:13:45 Reset CEM HV according to Pisabox instructions  - Christopher
Fri Feb 13 01:25:18
 - Christopher
-- Fri Feb 13 01:25:39 comment by...Christopher --  Hourly Plots
Fri Feb 13 01:55:11 CEM HV bars still yellow after reset. However, the off channel is now
only 32 low rather than 209 as before. - Christopher
Fri Feb 13 02:11:04
 - Christopher
-- Fri Feb 13 02:26:10 comment by...Christopher --  Hourly Plots
Fri Feb 13 03:17:00
 - Christopher
-- Fri Feb 13 03:17:24 comment by...Christopher --  hourly plot
Fri Feb 13 03:28:56 There was a reading failure in crate B0PCAL07. Shepherding failed. Rebooting with vxworks was successfull. - Simon :: (run 179056)
Fri Feb 13 04:10:38
 - Christopher
-- Fri Feb 13 04:10:55 comment by...Christopher --  Hourly Plots
Fri Feb 13 05:04:27 Process Systems COT Systems Alarm sounded briefly and cleared - Christopher
Fri Feb 13 05:14:22
 - Christopher
-- Fri Feb 13 05:14:43 comment by...Christopher --  Hourly Plots
Fri Feb 13 06:27:55
 - Christopher
-- Fri Feb 13 06:28:15 comment by...Christopher --  Hourly Plots
Fri Feb 13 07:06:42
 - Christopher
-- Fri Feb 13 07:07:03 comment by...Christopher --  Hourly Plots
Fri Feb 13 07:42:25 antiproton stack only 68.8E10 No clear when Tevatron plans to start beam studies  - Mario
Fri Feb 13 07:51:08 Shift Summary:
Smooth data taking.... 

     Single CEM HV channel had to be reset  



....for the rest.... 

  I found this on the www:  

Spanish : 

 "Cuando el indio va de culo, no hay barranco que lo ataje"  




End of Shift Numbers
CDF Run II

Runs                   179055,179056
Delivered Luminosity   403.5  
Acquired Luminosity    373.3  
Efficiency             92.5

 - mario
Fri Feb 13 07:55:19
Run Number Data Type Physics Table Begin Time End Time Live Time L1 Accepts L2 Accepts L3 Accepts Live Lumi, nb-1 GR SC RC
179055 x2BB6F BEAM PHYSICS_2_01 [4,416,424] 07:11:20 00:57:24 15:49:35 825,916,022 12,894,095 2,967,338 1386.428 1 1 1
179056 x2BB70 BEAM PHYSICS_2_01 [4,416,424] 01:11:11 06:31:15 236,219,420 3,354,540 856,820 328.919 1
Totals 07:55:02 22:20:50 1,062,135,442 16,248,635 3,824,158 1715.347
 - End of Shift Report
Fri Feb 13 16:05:11 Shift Summary:
* Tev Studies going on. 
* XFT reconfigured (SL2 masked) 
* Cable test done. 
* Trigger inhibit test done (could not reproduce problems ACEs reported). 
* XTRP test and L2 Pulsar test going on

End of Shift Numbers
CDF Run II

Runs                   179056
Delivered Luminosity   183.3  
Acquired Luminosity    170.9  
Efficiency             93.3

 - Young-Kee